What was found
AT CF1 FLOOR STRUCTURE AREA, CORROSION FOUND ON RH SILL BTW FR 22-23. AT CF1 FLOOR STRUCTURE AREA, ON RH SILL BTW FR 22-23 BLENDED OUT OF LIMIT. AT CF1 FLOOR STRUCUTRE AREA ON RH SILL BTW FR 22-23, LAYOUT PERFORMED AND DOUBLER REPAIR PART FABRICATED. AT CF1 FLOOR STRUCTURE AREA ON RH SILL BTW FR 22-23 REMOVED. AT CF1 FLOOR STRUCTURE AREA, RH SILL BTW 22-23 REPLACED WITH NEW PART.