What was found
CENTER FUSELAGE 1 - RH OMEGA BEAM UPPER SURFACE - BETWEEN FR18 - FR19 - CORROSION. PROCEEDED TO FABRICATE DOUBLE AND INSTALLED DOUBLER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CENTER FUSELAGE 1 - RH OMEGA BEAM UPPER SURFACE - BETWEEN FR18 - FR19 - CORROSION. PROCEEDED TO FABRICATE DOUBLE AND INSTALLED DOUBLER.