What was found
ON CF1, RH OMEGA BEAM PLATES AT FR22 AND 20 CORRODED. ON CF1, RH OMEGA BEAM PLATES AT FR22 AND 20 FOUND CORRODED OUT OF LIMIT. ON CF1, AT FR20 AND 22 AT RH OMEGA BEAM, 2 DOUBLER DRILLED. AT FR1, RH OMEGA BEAM AT FR20 AND 22, DOUBLER REPLACED