Service difficulty report · Doubler · Emb EMB145XR

Difficulty date
March 9, 2025
Submitted
May 7, 2025
Operation
Air carrier
Aircraft
N12136
Make and model
Emb EMB145XR
Aircraft serial
145719
Aircraft time
48,952 hours, 32,238 cycles
Part
Doubler
Condition
Corroded
Location
Zone 100
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION AROUND WATER SERVICE TUBING ON FUSELAGE DOUBLER PLATE. BLENDED CORROSION ON WATER SERVICE DOUBLER PLATE. DIMENSIONS FOR THE BLEND OUT IS 1.5"X.75"X.25" ORIGINAL THICKNESS IS .063" REMAINING IS .038" AND IS DETERMINED TO BE OUT OF LIMITS. REMOVED DOUBLER AT WATER SERVICE AREA. FABRICATED NEW DOUBLER. APPLIED PROTECTIVE COATINGS TO NEW DOUBLER. INSTALLED NEW DOUBLER AT WATER SERVICE AREA ON FUSELAGE.