What was found
CF1, LH OMEGA BEAM FOUND CORRODED AT FR20. CF1, LH OMEGA BEAM AT FR20 BLENDED OUT OF LIMITS. CF1, LH OMEGA BEAM CUT OUT PERFORMED. CF1, LH OMEGA BEAM REPAIRED
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CF1, LH OMEGA BEAM FOUND CORRODED AT FR20. CF1, LH OMEGA BEAM AT FR20 BLENDED OUT OF LIMITS. CF1, LH OMEGA BEAM CUT OUT PERFORMED. CF1, LH OMEGA BEAM REPAIRED