What was found
CENTER FUSE I, CENTER CROSSBEAM AT FRAME 20, LOWER AND UPPER SURFACE CORRODED. CENTER FUSE I CENTER CROSSBEAM AT FR20 BLENDED OUT OF LIMITS. CENTER FUSE I, CENTER CROSSBEAM AT FRAME 20 MADE REPAIR PART FABRICATED. CENTER FUSE I, CENTER CROSSBEAM AT FRAME 20 MADE REPAIR PART INSTALLED.