What was found
DURING ANNUAL 100 HR INSPECTION, DIFFERENTIAL PRESSURE CYLINDER LEAK CHECK OF RT ENGINE, CYLINDER NR 3 FAILED, 0/80 PSI. VISUAL INSPECTION CONFIRMED A VISIBLE CRACK APPROXIMATELY 2" INBD FROM WHERE HEAD AND BARREL MEET AT APPROXIMATELY THE 3 O'CLOCK POSITION.