What was found
DURING CLIMB-OUT FLIGHT CREW REPORTED SEVERE NR 1 PROPELLER RPM FLUCTUATION. ENGINE SHUTDOWN PERFORMED IAW AFM. NR 1 PROPELLER VALVE HOUSING REPLACED IAW LAC JOB CARD HN7101 WITH SATISFACTORY OPS CHECK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CLIMB-OUT FLIGHT CREW REPORTED SEVERE NR 1 PROPELLER RPM FLUCTUATION. ENGINE SHUTDOWN PERFORMED IAW AFM. NR 1 PROPELLER VALVE HOUSING REPLACED IAW LAC JOB CARD HN7101 WITH SATISFACTORY OPS CHECK.