What was found
DURING SCHEDULED C-9 CHECK, FOUND BELLY FLOORBEAM RT END FITTING WITH EXFOLIATION CORROSION AT FS557, RBL62, WL144. REPAIR ACCOMPLISHED BY REPLACING END FITTING IAW SMP583, CHAP 51-60 & 51-70.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C-9 CHECK, FOUND BELLY FLOORBEAM RT END FITTING WITH EXFOLIATION CORROSION AT FS557, RBL62, WL144. REPAIR ACCOMPLISHED BY REPLACING END FITTING IAW SMP583, CHAP 51-60 & 51-70.