What was found
DURING SCHEDULED C-12, AFTER REMOVING THE RAMP DOOR PEDESTAL FAIRING FOR ACCESS, FOUND CRACKED STIFFENER AT RAMP FS 9, RBL12. REPAIR BY STIFFENER REPLACEMENT ACCOMPLISHED IAW SMP 583 SRM, CHAPTER 51-60 AND 51-70. NR 2022.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C-12, AFTER REMOVING THE RAMP DOOR PEDESTAL FAIRING FOR ACCESS, FOUND CRACKED STIFFENER AT RAMP FS 9, RBL12. REPAIR BY STIFFENER REPLACEMENT ACCOMPLISHED IAW SMP 583 SRM, CHAPTER 51-60 AND 51-70. NR 2022.