What was found
DURING SCHEDULED B-3 CHECK, FOUND THE BS 270 FUSELAGE FRAME CRACKED . REPAIRED IAW SMP 583 SRM 51-140-21.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED B-3 CHECK, FOUND THE BS 270 FUSELAGE FRAME CRACKED . REPAIRED IAW SMP 583 SRM 51-140-21.