What was found
DURING C-CHECK, FOUND CORROSION ON FLOOR SUPPORT CHANNEL RBL10 BETWEEN STA 231 AND STA 236.5. MX FABRICATED NEW FLOOR SUPPORT CHANNEL STRAPS IAW SRM 51-40-40160. ALODINED, PRIMED AND TOPCOATED IAW SRM 51-20-42/43.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, FOUND CORROSION ON FLOOR SUPPORT CHANNEL RBL10 BETWEEN STA 231 AND STA 236.5. MX FABRICATED NEW FLOOR SUPPORT CHANNEL STRAPS IAW SRM 51-40-40160. ALODINED, PRIMED AND TOPCOATED IAW SRM 51-20-42/43.