What was found
FOUND DURING C-CHECK, SEVERAL AREAS OF CORROSION ON RBL 0.00 FLOOR PANEL FLANGE FROM STA 294.0 TO STA 380.0. REFER TO CELSIUS TASK CARD 2564 W/O 18783, AND SAAB STATEMENT 72SDS2818. MAINTENANCE REMOVED CORROSION IAW SRM 51-70-40. INSPECTED AND FOUND OUT OF LIMITS REF SRM 51-10-10. FABRICATED REPAIR ANGLE PER PRINCIPLES OF SAAB SRM 53-70-60. ALODINED, PRIMED AND TOPCOATED REPAIR ANGLE AND REPAIR AREA PER SRM 51-20-42/43. INSTALLED REPAIR ANGLE IAW SAAB STATEMENT 72SDS2818 AND 72SDS2692.