What was found
DURING FLIGHT GREEN SYSTEM HI TEMP LIGHT ILLUMINATED APPROXIMATELY 1 HOUR INTO FLIGHT. MAINTENANCE REPLACED NR 3 ENGINE EDP. OPS AND CHECK LEAK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING FLIGHT GREEN SYSTEM HI TEMP LIGHT ILLUMINATED APPROXIMATELY 1 HOUR INTO FLIGHT. MAINTENANCE REPLACED NR 3 ENGINE EDP. OPS AND CHECK LEAK GOOD.