What was found
DURING INSPECTION IN LCQ, RT STA 176.1 CO-PILOT COCKPIT FLOOR CORRODED HEAVILY. MAINTENANCE REMOVED CORRODED AREA AND INSTALLED DOUBLER REPAIR IAW MESABA EO S53197. A/C RELEASE DATE 2/5/2004.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION IN LCQ, RT STA 176.1 CO-PILOT COCKPIT FLOOR CORRODED HEAVILY. MAINTENANCE REMOVED CORRODED AREA AND INSTALLED DOUBLER REPAIR IAW MESABA EO S53197. A/C RELEASE DATE 2/5/2004.