What was found
DURING SCHEDULED CAPACITY CHECK, IN HOUSE WO 369067, EMERGENCY POWER SUPPLY P/N 501-1228-04, S/N 2056, FAILED CAPACITY CHECK. MAINTENANCE REPLACED 12 EA P/N 549-1170-01 CELLS, UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 6/12/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED CAPACITY CHECK, IN HOUSE WO 369067, EMERGENCY POWER SUPPLY P/N 501-1228-04, S/N 2056, FAILED CAPACITY CHECK. MAINTENANCE REPLACED 12 EA P/N 549-1170-01 CELLS, UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 6/12/04.