What was found
EMERGENCY POWER SUPPLY P/N 3301-51, S/N 2158 FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY ASSEMBLY AND RELMS K, K2, K3. PASSED CMM TESTS. A/C RETURNED TO SERVICE 7/8/04. REFER TO WO 369561 FOR ADDITIONAL INFORMATION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EMERGENCY POWER SUPPLY P/N 3301-51, S/N 2158 FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY ASSEMBLY AND RELMS K, K2, K3. PASSED CMM TESTS. A/C RETURNED TO SERVICE 7/8/04. REFER TO WO 369561 FOR ADDITIONAL INFORMATION.