What was found
EMERGENCY POWER SUPPLY P/N 501-1712-02, S/N 1833 FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY ASSEMBLY P/N 549-1324-06 AND TESTED GOOD. PASSED CMM TESTS. A/C RETURNED TO SERVICE 7/12/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EMERGENCY POWER SUPPLY P/N 501-1712-02, S/N 1833 FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY ASSEMBLY P/N 549-1324-06 AND TESTED GOOD. PASSED CMM TESTS. A/C RETURNED TO SERVICE 7/12/04.