What was found
DURING SCHEDULED CAPACITY CHECK, BATTERY PACK PN 61-0478-9, SN/0202641 FAILED. MAINTENANCE REPLACED CELL PACK PN 55-2198-1. UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 8/18/04. REFER TO WO NR 373761 FOR ADDITIONAL INFORMATION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED CAPACITY CHECK, BATTERY PACK PN 61-0478-9, SN/0202641 FAILED. MAINTENANCE REPLACED CELL PACK PN 55-2198-1. UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 8/18/04. REFER TO WO NR 373761 FOR ADDITIONAL INFORMATION.