What was found
EMERGENCY POWER SUPPLY P/N 3301-51, S/N 1348 REPORTED INOP. UNIT FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY P/N 3301-31 UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 9/17/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EMERGENCY POWER SUPPLY P/N 3301-51, S/N 1348 REPORTED INOP. UNIT FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY P/N 3301-31 UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 9/17/04.