What was found
BATTERY PACK WAS REMOVED FOR SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED CELL PACK 61-2274-1 AFTER CAPACITY CHECK FAILED. UNIT PASSES CMM TESTS. A/C RETURNEDTO SERVICE 9/24/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BATTERY PACK WAS REMOVED FOR SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED CELL PACK 61-2274-1 AFTER CAPACITY CHECK FAILED. UNIT PASSES CMM TESTS. A/C RETURNEDTO SERVICE 9/24/04.