What was found
BATTERY PACK WAS REMOVED FOR SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY ASSEMBLY AFTER CAPACITY CHECK FAILED. P/N 3301-31 UNIT PASSES CMM TESTS. A/C RETURNEDTO SERVICE 9/28/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BATTERY PACK WAS REMOVED FOR SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY ASSEMBLY AFTER CAPACITY CHECK FAILED. P/N 3301-31 UNIT PASSES CMM TESTS. A/C RETURNEDTO SERVICE 9/28/04.