What was found
DURING 6Y/4Y INSPECTION IN LAN, MAINTENANCE FOUND RT FLAP BEAVERTAIL BULKHEAD CRACKED AT REAR SPAR MOUNT. MAINTENANCE REPAIRED IAW SRM 57-20-10. AIRCRAFT RETURNED TO SERVICE 10/12/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 6Y/4Y INSPECTION IN LAN, MAINTENANCE FOUND RT FLAP BEAVERTAIL BULKHEAD CRACKED AT REAR SPAR MOUNT. MAINTENANCE REPAIRED IAW SRM 57-20-10. AIRCRAFT RETURNED TO SERVICE 10/12/04.