What was found
DURING SCHEDULED CAPACITY CHECK, BATTERY POWER SUPPLY P/N 3301-51, S/N 2170 HAS BLOWN FUSE. MAINTENANCE REPLACED FUSE P/N 779 -435-72, UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 12/23/04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED CAPACITY CHECK, BATTERY POWER SUPPLY P/N 3301-51, S/N 2170 HAS BLOWN FUSE. MAINTENANCE REPLACED FUSE P/N 779 -435-72, UNIT PASSES CMM CHECKS. A/C RETURNED TO SERVICE 12/23/04.