What was found
BATTERY PACK FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED CELL PACK ASSEMBLY, P/N 61-2274-1. UNIT PASSES ALL CMM CHECKS. A/C RETURNED TO SERVICE 1/5/05.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BATTERY PACK FAILED SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED CELL PACK ASSEMBLY, P/N 61-2274-1. UNIT PASSES ALL CMM CHECKS. A/C RETURNED TO SERVICE 1/5/05.