SDR MALA110267

Service difficulty report · Reservoir · Cndair CL6002D24

Difficulty date
December 6, 2011
Submitted
December 12, 2011
Operation
Air carrier
Aircraft
N927XJ
Make and model
Cndair CL6002D24
Aircraft serial
15188
Aircraft time
8,838 hours, 5,615 cycles
Part
Reservoir
Condition
Leaking
Location
Hyd System
Stage of operation
CR
How discovered
9
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

IN CRUISE FLT HYDRAULIC SYS 3 HIGH TEMP FOLLOWED ABNORMAL PROCEDURE TURNED 3B OFF AND TEMP STABILIZED AND DECREASED TO 85. HYD 3 LOW PRESS CAUTION. FOLLOWED ABNORMAL PROCEDURES. SUBSEQUENTLY ACCUMULATOR PRESSURE DEPLETED TO ZERO. TURNING PUMP 3B BACK ON DID NOT INCREASE PRESSURE FROM ZERO. PERFORMED MANUAL GEAR EXTENSION AFTER NO LUCK WITH GEAR HANDLE. 3 GREEN THEN PRESSURE CAME BACK. R & R NR 3 HYD SYS RESERVOIR IAW AMM 29-10-00-710-802. R & R NR 3 HYD SYS TEMP TRANSDUCER IAW AMM 29-12-30. CLOSED ACCESS PANEL IAW AMM 53-52-32. OPS CHECK GOOD. NO FAULT MESSAGES NOTED.