What was found
DURING A SCHEDULED INSPECTION IN MSP, THE AFT CARGO DOOR FRAME WAS CRACKED AT FS 438.06. REPAIRS WERE COMPLETED BY REMOVING THE DAMAGED AREA, INSTALLING A REPAIR DOUBLER IAW FAC LAR-95-MALA-052. (Z)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING A SCHEDULED INSPECTION IN MSP, THE AFT CARGO DOOR FRAME WAS CRACKED AT FS 438.06. REPAIRS WERE COMPLETED BY REMOVING THE DAMAGED AREA, INSTALLING A REPAIR DOUBLER IAW FAC LAR-95-MALA-052. (Z)