What was found
MSP - DURING A SCHEDULED INSPECTION, MAINTENANCE PERSONNEL NOTED A CRACK IN THE FUSELAGE FORWARD CARGO DOOR FRAME. THEY REPAIRED THE CRACK BY REMOVING THE CRACKED AREA AND INSTALLING DOUBLERS IAW FAC ARP 53-20-9503. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MSP - DURING A SCHEDULED INSPECTION, MAINTENANCE PERSONNEL NOTED A CRACK IN THE FUSELAGE FORWARD CARGO DOOR FRAME. THEY REPAIRED THE CRACK BY REMOVING THE CRACKED AREA AND INSTALLING DOUBLERS IAW FAC ARP 53-20-9503. (X)