What was found
DURING A SCHEDULED INSPECTION IN MSP, MAINTENANCE FOUND THE RIGHT VERTICAL STABILIZER SKIN CRACKED AFT OF THE CUT OUT FOR THE HORIZONTAL STABILIZER SPAR. PERFORMED REPAIR TO RIGHT VERTICAL STAB SKIN BY REMOVAL OF PREVIOUS REPAIR. STOP DRILLED NEW CRACK. FABRICATED AND WET INSTALLED REPAIR DOUBLER IAW FAC SRM 51-90-04 REPAIR NR 11. (M)