What was found
DURING A SCHEDULED INSPECTION IN MSP, MAINTENANCE PERFORMED A REPAIR TO THE CARGO DOOR FRAME, P/N 27-22085, AT FS 491.00 BY REMOVING DAMAGED GAS STRUT MOUNT HOLE (1.625 BY 1.825). FABRICATED, PREPPED AND INSTALLED A REPAIR ANGLE, REPAIR PLATE, AND FILLER IAW FAIRCHILD ARP 53-20-9503 DATED MARCH 1. (M)