What was found
ACFT REJECTED TAKE OFF AT 70 KNOTS DUE TO RT ENGINE DID NOT ACCELERATE. MX PERSONNEL REPLACED PRBC`S IAW MM 75-31-01 AND FCU IAW 73-20-01. ADDITIONALLY THE PS3 WAS VERIFIED AND CLEANED, THE BLEED VALVES WERE LUBRICATED IAW 75-31-05 AND TRIM BOTH ENGINES WAS PERFORMED IAW MM 71-00-00, ALL CORRECT. AS A COMPLIMENTARY ACTION, A HIGH ENERGY STOP INSPECTION WAS PERFORMED IAW MM 05-57-00, NO DAMAGES WERE FOUND.