What was found
ASH FLT 2781 ELP - PHX, FLAPS FAIL AT 8 DEGREES AT GATE DURING POWER TRANSFER FROM GROUND TO APU. CONTRACT MX COMPLIED WITH PART A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ASH FLT 2781 ELP - PHX, FLAPS FAIL AT 8 DEGREES AT GATE DURING POWER TRANSFER FROM GROUND TO APU. CONTRACT MX COMPLIED WITH PART A.