What was found
DURING HEAVY CHECK INSPECTIONS ON CFIII FLOOR STRUCTURE, CORROSION FOUND ON LH UPER SHEET FLOORSU PPORT BETWEEN FR 85-86 AT LBLI I. UPPER SHEET HAS BEEN REMOVED AND REPLACED IAW ERJ 1 75 SRM 51-41-01 REV. 53 .
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK INSPECTIONS ON CFIII FLOOR STRUCTURE, CORROSION FOUND ON LH UPER SHEET FLOORSU PPORT BETWEEN FR 85-86 AT LBLI I. UPPER SHEET HAS BEEN REMOVED AND REPLACED IAW ERJ 1 75 SRM 51-41-01 REV. 53 .