What was found
DURING HEAVY CHECK, INSPECTIONS OF THE INTERANAL FUSELAGE STRUCTURE AT CFIII, CORROSION FOUND ON ANGLE SUPPORT, FR 90, RBL 12. REPLACED IAW ERJ 175 SRM 51-41-02, SRM 51-41-01, REV# 45, MAY-28-2021.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK, INSPECTIONS OF THE INTERANAL FUSELAGE STRUCTURE AT CFIII, CORROSION FOUND ON ANGLE SUPPORT, FR 90, RBL 12. REPLACED IAW ERJ 175 SRM 51-41-02, SRM 51-41-01, REV# 45, MAY-28-2021.