What was found
DURING HEAVY CHECK INSPECTIONS ON CFIII FLOOR STRUCTURE, CORROSION FOUND ON RH BEAM BETWEEN FR 85-89. RH BEAM BETWEEN FR 85-89 REPLACED IAW SRM 51-42-01, 51-41-01 REV 45 MAY 28/21 AND 51-43-03 REV 50.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK INSPECTIONS ON CFIII FLOOR STRUCTURE, CORROSION FOUND ON RH BEAM BETWEEN FR 85-89. RH BEAM BETWEEN FR 85-89 REPLACED IAW SRM 51-42-01, 51-41-01 REV 45 MAY 28/21 AND 51-43-03 REV 50.