As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
PERFORMED INSPECTION OF THE ICE VANE ACTUATOR MOUNT STRUCTURE FOR CRACKING. CRACK WAS FOUND ON THE #2 ICE VANE ACTUATOR STRUCTURE. PERMANENT REPAIR TO BE COMPLETED. PERFORMED MARKING OF THE CRACK ENDS AS INSTRUCTED IN THE ENGINEERING LETTER. REINSPECTION TO BE PERFORMED EVERY 25 FLIGHT HOURS FOR CRACK GROWTH OR ADDITIONAL DAMAGE.