What was found
MKE - FUSELAGE FRAME 294 HAD 3 EACH DRILL STARTS ON FORWARD SURFACE AT LONGERON 6 RIGHT REAR RIVETS. FABRICATED AND INSTALLED FRAME REPAIR. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MKE - FUSELAGE FRAME 294 HAD 3 EACH DRILL STARTS ON FORWARD SURFACE AT LONGERON 6 RIGHT REAR RIVETS. FABRICATED AND INSTALLED FRAME REPAIR. (X)