What was found
UPPER FUSELAGE FRAME STATION 718 HAS TWO FASTENER HOLES THAT DO NOT HAVE (2 D) SPACING INBOARD OF LONGERON 6 RIGHT. -- PLUGGED HOLES, FABRICATED AND INSTALLED REPAIR ANGLE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
UPPER FUSELAGE FRAME STATION 718 HAS TWO FASTENER HOLES THAT DO NOT HAVE (2 D) SPACING INBOARD OF LONGERON 6 RIGHT. -- PLUGGED HOLES, FABRICATED AND INSTALLED REPAIR ANGLE.