What was found
RIGHT FRAME AT STATION 362 HAS 3 EXISTING PILOT HOLES NOT LINING UP WITH EXISTING FASTENER HOLES PATTERN. -- LOCATED AND DRILLED STRAP FABRICATED AND INSTALLED STRAP.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT FRAME AT STATION 362 HAS 3 EXISTING PILOT HOLES NOT LINING UP WITH EXISTING FASTENER HOLES PATTERN. -- LOCATED AND DRILLED STRAP FABRICATED AND INSTALLED STRAP.