Service difficulty report · Power Supply · Cndair CL6002C10

Difficulty date
February 27, 2014
Submitted
March 3, 2014
Operation
Air carrier
Aircraft
N163GJ
Make and model
Cndair CL6002C10
Aircraft serial
10255
Aircraft time
22,436 hours, 15,190 cycles
Part
Power Supply
Condition
Overheated
Location
Lavatory
Stage of operation
LD
How discovered
O
Nature of condition
B
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SMOKE IN AFT LAVATORY WARNING WITH VISIBLE SMOKE, AN EMERGENCY WAS DECLARED. INSPECTED & FOUND AFT LAVATORY LIGHT POWER SUPPLY HEATING EXCESSIVELY. R & R LAVATORY LIGHT POWER SUPPLY & ALL OF THE VANITY LIGHT BULBS IAW CRJ700 AMM 33-25-03 & 33-25-05. PERFORMED EXTENDED OPERATIONS CHECK OF LAVATORY LIGHTING, NO DEFECTS OBSERVED.