What was found
R ENG PRV EICAS MSG ON CLIMB AND EXTINGUISH AROUND 18000 FT. PER FIM 36-10 FLT 847 REMOVED AND REPLACED PRV CONTROLLER IAW AMM 36-11-19 LEAK CHECK AND INSTALLATION TEST NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R ENG PRV EICAS MSG ON CLIMB AND EXTINGUISH AROUND 18000 FT. PER FIM 36-10 FLT 847 REMOVED AND REPLACED PRV CONTROLLER IAW AMM 36-11-19 LEAK CHECK AND INSTALLATION TEST NORMAL.