What was found
DURING "M" CHECK, FOUND CRACKS IN BS 820 TENSION TIE FRAME WEB FASTENER HOLES RH NR 4, NR 10 AND LT NR 4, NR 9,NR 10, NR 11 AND NR 13. ALSO, FOUND ONE FASTENER HOLE CRACKED ON FAILSAFE CHORD ON S10A. REPAIRED PER EA 209243 SECT I AND SECT II SECTION III AND IV REQUIRE INSPECTIONS AT 3000 CYCLE INTERVALS.