What was found
DURING SCHEDULED NR 2 ENGINE CHANGE FOUND CRACK IN PYLON SIDE SKIN AT NAC STA 128. REPAIRED PER EA 55-210070 SECTION I, SECTION II TO BE ACCOMPLISHED WITHIN 24 MONTHS OF SECTION I.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED NR 2 ENGINE CHANGE FOUND CRACK IN PYLON SIDE SKIN AT NAC STA 128. REPAIRED PER EA 55-210070 SECTION I, SECTION II TO BE ACCOMPLISHED WITHIN 24 MONTHS OF SECTION I.