What was found
HYD G RSVR LO LVL DISPLAYED ON ECAM. FOLLOWED COM PROCEDURES. GREEN HYDRAULIC SYSTEM WAS DEPLETED FOR 3 MINUTES BEFORE EDP WAS SHUT OFF. LANDING GEAR GRAVITY EXTENDED, LANDING UNEVENTFULLY, AND TOWED TO GATE. REPLACED RH MAIN LANDING GEAR DOOR GROUND OPENING BYPASS VALVE. LEAK CHECKS GOOD.