What was found
SJO - DURING C-CHECK ROUTINE INSPECTION AS PER WORK CARD NR J2C-46-5223C, A CRACK WAS NOTED ON BEAM NR 7 ANGLE, OF THE L1 DOOR. THE CRACK WAS 1.25 INCHES LONG. INSTALLED ANGLE REPAIR AS PER SRM 51-40-3 FIG 1. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SJO - DURING C-CHECK ROUTINE INSPECTION AS PER WORK CARD NR J2C-46-5223C, A CRACK WAS NOTED ON BEAM NR 7 ANGLE, OF THE L1 DOOR. THE CRACK WAS 1.25 INCHES LONG. INSTALLED ANGLE REPAIR AS PER SRM 51-40-3 FIG 1. (M)