What was found
CREW REPORTED RETURN TO BLOCKS DUE NR 2, 3 AND 4 GENERATORS WOULD NOT PARALLEL. RESET SPLIT SYSTEM BREAKER, PERFORMED BCU-1 AND BCU-2 SYSTEM GROUND TEST PER MM 24-11-00. ALL OPS NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CREW REPORTED RETURN TO BLOCKS DUE NR 2, 3 AND 4 GENERATORS WOULD NOT PARALLEL. RESET SPLIT SYSTEM BREAKER, PERFORMED BCU-1 AND BCU-2 SYSTEM GROUND TEST PER MM 24-11-00. ALL OPS NORMAL.