What was found
NR 3 ENGINE CORE COWLING - AFT HINGE SUPPORT ASSEMBLY - INTERIM REPAIR TO AFT LUG. REPAIRED PER BOEING 8100-9 DATED 03FEB2006.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 3 ENGINE CORE COWLING - AFT HINGE SUPPORT ASSEMBLY - INTERIM REPAIR TO AFT LUG. REPAIRED PER BOEING 8100-9 DATED 03FEB2006.