What was found
ON CLIMB-OUT OF NRT, NR 3 HYDRAULIC SYSTEM WAS LOST. QUANTITY AND PRESSURE DROPPED TO ZERO. FOUND UPPER RUDDER ACTUATOR LEAKING FROM MATING SURFACE OF PROPORTIONAL VALVE AND ACTUATOR. REPLACED GASKET PLATE. NO LEAKS NOTED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ON CLIMB-OUT OF NRT, NR 3 HYDRAULIC SYSTEM WAS LOST. QUANTITY AND PRESSURE DROPPED TO ZERO. FOUND UPPER RUDDER ACTUATOR LEAKING FROM MATING SURFACE OF PROPORTIONAL VALVE AND ACTUATOR. REPLACED GASKET PLATE. NO LEAKS NOTED.