What was found
EICAS MESSAGES HYDRAULIC PRESSURE SYS 1 FOLLOWED ECL/QRH PROCEDURES, LANDED. REMOVED NR 1 ADU IAW MM 29-11-08, OPS NORMAL, INSPECTED NR 1 EDP IAW MM 29-11-05 BOTH PUMPS OPS & LEAK CHECKD GOOD. HYD SYSTEM, OPS CHECK NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EICAS MESSAGES HYDRAULIC PRESSURE SYS 1 FOLLOWED ECL/QRH PROCEDURES, LANDED. REMOVED NR 1 ADU IAW MM 29-11-08, OPS NORMAL, INSPECTED NR 1 EDP IAW MM 29-11-05 BOTH PUMPS OPS & LEAK CHECKD GOOD. HYD SYSTEM, OPS CHECK NORMAL.