What was found
CORROSION ON SUPPORT-Z AT BS 1240 BETWEEN LBL 40 AND LBL 80. REMOVED CORROSION PER BOEING SRM 51-10-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION ON SUPPORT-Z AT BS 1240 BETWEEN LBL 40 AND LBL 80. REMOVED CORROSION PER BOEING SRM 51-10-01.